Probability of Completing a Project: Normal Distribution

Loading...
Visualiser le programme de cours

Compétences que vous apprendrez

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Avis

4.8 (874 notes)
  • 5 stars
    695 ratings
  • 4 stars
    161 ratings
  • 3 stars
    13 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
BA

Mar 16, 2019

It was a very dynamic course which contained many useful knowledge. I gained many important information that will help me a lot.\n\nThanks to Coursera and to my Instructors.

AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

À partir de la leçon
Program Evaluation & Review Technique (PERT) and Range Estimating

Enseigné par

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explorer notre catalogue

Rejoignez-nous gratuitement et obtenez des recommendations, des mises à jour et des offres personnalisées.