LOB Example: Develop a Schedule

Loading...
Visualiser le programme de cours

Compétences que vous apprendrez

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Avis

4.8 (1,272 évaluations)
  • 5 stars
    79.40%
  • 4 stars
    18.39%
  • 3 stars
    1.65%
  • 2 stars
    0.31%
  • 1 star
    0.23%
LF

May 14, 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

GJ

Sep 28, 2019

This course is dedicated to anyone in the construction management industry and/or the willingness to learn about construction management. I will highly recommend this course!

À partir de la leçon
Linear Construction Operations and Line of Balance
Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.

Enseigné par

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explorer notre catalogue

Rejoignez-nous gratuitement et obtenez des recommendations, des mises à jour et des offres personnalisées.