LOB Diagram

Loading...
Visualiser le programme de cours

Compétences que vous apprendrez

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Avis

4.8 (1,319 évaluations)
  • 5 stars
    79.53%
  • 4 stars
    18.27%
  • 3 stars
    1.66%
  • 2 stars
    0.30%
  • 1 star
    0.22%
VT

Dec 24, 2019

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF

May 14, 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

À partir de la leçon
Linear Construction Operations and Line of Balance
Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.

Enseigné par

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explorer notre catalogue

Rejoignez-nous gratuitement et obtenez des recommendations, des mises à jour et des offres personnalisées.