Integration of the Model and Schedule Tools

Loading...
Eye
Visualiser le programme de cours

Compétences que vous apprendrez

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Avis

4.8 (825 notes)
  • 5 stars
    658 ratings
  • 4 stars
    151 ratings
  • 3 stars
    11 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

EJ

Apr 20, 2019

I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.

À partir de la leçon
Technology Applications for Scheduling
Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.

Enseigné par

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University